Train track Zwolle

700 meters, 65,000 Oskam blocks.

project description

700 meters, 65,000 Oskam blocks. Those are impressive figures of the so-called 'dive under' that is being constructed for the new track junction at Herfte. A sizeable operation of roughly 170 million euros. Instead of removing the sandy loam from the construction pit, KWS Infra Zwolle turned it into blocks that are reused at the same location.